this bridge will connect Bakkal (Katra) and Kauri (Srinagar) , above the Chenab River in J&K.
facts of the Bridge are;
- Deck height : 359 m (1178 ft) which is 30 m higher than the Eiffel Tower.
- Bridge length : 1,315 m (4,314 ft).
- Estimated cost of construction : INR 1250 crore .
- lifespan : 120 year.
- completion deadline : May 2019.
- Site specific seismic spectra developed by : (IIT) Roorkee.
- construction by : Afcons Infrastructure Limited, a part of the Shapoorji Pallonji Group, the third-largest construction group in India.
- to know in details : https://en.wikipedia.org/wiki/Chenab_Bridge.